Backflow Preventer Device Design Data Sheet
A backflow preventer is a device that’s installed on your home’s water pipes that allows water to flow in one direction but never in the opposite direction. Its sole job is to prevent drinking water from being contaminated due to backflow.
General Service Application
After the site plan is approved and signed by the Chief Engineer or his designee, a General Service Application (GSA) must be completed by the owner of the property, or the owner's agent, prior to the initiation of the approved work.
规划要求
Massachusetts state law requires anyone who digs to notify utility companies before starting to excavate. Digging can be dangerous and costly without knowing where underground facilities are located.
呼叫 挖掘安全 at 811 for more information.
污水治理 Application
Sewer abatements allow a separate meter, 由BWSC批准, to be placed on the property to register water not entering BWSC's sewer system. To learn more visit the 污水治理 page.
污水治理
The following items must be completed and submitted to BWSC by the legal title holder of property prior to any Sewer Charge Abatement Approval:
- 污水治理 Program Application/Drawing Sheet
- 数据设计表
- 素描纸
- MTU接收号
检查
Cross Connection Inspection
An annual inspection is required for all double-check valve assembly type backflow prevention devices. All other types require semi-annual inspection.
Cross Connection Inspection Regulations
Backflow Preventer Device Design Data Sheet
Industrial 雨水 Inspection
Industrial stormwater inspections are scheduled to be conducted bi-annually. The inspections are required by the 环境al Protection Agency (EPA) for the prevention of pollution to rivers, 湖泊, 流, 和海洋.
This is the Industrial Facility 雨水 Pollution Prevention Program Inspection Fee Schedule.
Industrial Facility Type | 成本 |
---|---|
Major Industry Initial Inspection | $260.00 |
Major Industry Bi-annual Inspection | $225.00 |
Major Industry Certificate of No Exposure | $115.00 |
Minor Industry/Business Initial Inspection | $150.00 |
Minor Industry/ Business Bi-annual Inspection | $150.00 |
Minor Industry/Business Certificate of No Exposure | $75.00 |
Major Industry = 1 Acre or greater
Minor Industry/Business = Less than 1 Acre
水 & Sewer Construction Inspection
A daily fee is assessed while providing water and sewer inspection services on construction projects of one or more day's duration.
Special Service Fees
水 or Sewer Pipe Inspection
检查 that take place during regular work hours will be charged $350.00. 检查 done outside regularly scheduled work hours (overtime) will be charged $405.00. 检查 done on Sundays or holidays will be charged $465.00 per connection or disconnection.
Special Service Fees
许可证
Dewatering Discharge 许可证
To learn more about allowable dewatering discharges continue to the Dewatering Discharge Page.
A Dewatering Discharge Permit application must be filed for certain discharges to BWSC's wastewater or storm drainage systems.
Hydrant Meter 许可证
BWSC Hydrant Meters 许可证 are available for construction purposes.
A $750.00存款 is required for the meter/permit.
All applicable fees will be deducted from the deposit:
- The rental charge for a 90-day period is $100.00
- 水 usage is additional
- If the water returns to the sewer system, there is also a sewer charge
*Additional charges may apply
BWSC’s meter must be returned to BWSC at the end of the 90-day period for reading and billing purposes. If the customer requires extended use of the hydrant meter, a new permit can be issued for an additional 90 days with an additional $750.00存款.
To obtain a Hydrant Meter Permit or for more information, please contact Metering at 617-989-7138.